LINKY Top

elster project

Mechanical redesign of Linky Elster 90A (Bottom electrical connections) into Linky 60A (Top electrical connections) for Erdf

#Electricity metering #PLC #Altium #ProEngineer

Challenges & objectives

Re-design of plastic injection molds

Redefining PCB dimensions

Redefining PCB constraints

PCB re-layout

No functional and EMC regression

Requirements

International customer teams

Co-contracting with our subsidiary Médial Concept

20% reduction in PCB size

EMC, PLC, ICT and Euridis electrical testing

Steering the production of plastic tools

Our achievements